Massive Mixed Use Building,
Lower Manhattan

CWT moved and installed two cells of a 1500 ton cooling system. Comprehensive piping upgrade was completed before deadline.

Premium 40-Story Midtown
Office Tower, NYC

A CWT field installation added capacity to existing infrastructure with a minimally invasive presence and timely performance.

50-Story Office Tower

9000 GPM field installation of supplemental tower cells. CWT completed the job within a limited window on time.

Large Hotel, Westchester

This busy hotel did not want a crane on site and wanted noise minimized. Field installation was accomplished on time.

National TV Network Studio

CWT teams worked day and night on a long holiday weekend during summer season to replace both cells of a 3000 GPM tower while the studio kept working.

Midtown Office Tower

CWT installed unit under a highly regimented work procedure without disturbing occupants of a high security building on schedule.

15000 GPM Power Plant, Bronx

CWT replaced entire splash bar wet deck, rebuilt valves and installed all new louvers and stainless steel casing, all on schedule.

A-Class Office Building, Midtown

CWT cut louvers in bulkhead wall and replaced 3600 GPM tower one cell at a time while keeping the building on line.